Location:
Melrose Park, IL
Client:
Gottlieb Memorial Hospital
Architect:
HDR Architects

The 2nd floor ICU renovation project consisted of a complete demolition and renovation of the existing 2 South floor. Several new technologies were incorporated into the ICU renovation that addressed infectious control procedures. The copper impregnated countertops at the Nurse’s Station and Patient Rooms using EPA Registered EOScu Preventive|Biocidal Surfaces provided continuous bacteria killing at the source. A similar product used on the project was the Floorfolio vinyl flooring which incorporates a silver infusion that is also a natural germicide. Other innovations incor-porated into the project were high efficiency, low energy sliding patient room doors, “white noise” speakers used to reduce background noise, and plasma I-bars at all of the existing air handlers. I-bars kill 99.8 percent of all germs via ultraviolet light and virtually eliminate all odor.

  • 13,000 sq ft
  • Duration: 8 months
  • Floorfolio vinyl flooring
  • EPA Registered EOScu Preventive Biocidal Surfaces
  • “White noise” speakers

No items found.
Projects

Recent Projects